January 31, 2011 — Culbreth Road on the University of Virginia Grounds will be closed to through traffic from Feb. 14 to March 13 to accommodate construction of the marching band rehearsal hall.
The road will be blocked from the entrance to the Arts Parking Garage to Ruffin Hall. Traffic barricades will be in place at these points.
The remainder of Culbreth Road will be open and accessible. Motorists can access the parking garage and the Drama Building from University Avenue, and Ruffin Hall and Zeta Psi from Rugby Road.
The road will be blocked from the entrance to the Arts Parking Garage to Ruffin Hall. Traffic barricades will be in place at these points.
The remainder of Culbreth Road will be open and accessible. Motorists can access the parking garage and the Drama Building from University Avenue, and Ruffin Hall and Zeta Psi from Rugby Road.
— By Matt Kelly
Media Contact
Article Information
January 31, 2011
/content/culbreth-road-close-band-construction-project